Process
Warm air heater for the concrete production process
Belarus
- Year: 2015
- Series: SPECIAL
- Total Power: 230 kW
Request
- Defrosting process of various materials stocked in bunker, used for the production of concrete.
- Production of overheated air from −24°C to +210°C.
- Useful static pressure 12.000 Pa.
- Outdoor installation at −25°C.
Plant solution
- 2 autonomous packaged special warm air heaters.
- Air tubes heat exchanger specifically designed.
- Industrial centrifugal fan with backward blades for very high static pressure.
- Temperature deviation exceeding 230 K.